Greenbank BESS

With the capacity to power 66,000 homes for 2 hours during peak demand, the 200MW Greenbank Battery Energy Storage System is connected to Powerlink Queensland’s Greenbank Substation, supplying electricity to the Gold Coast, Logan and South Brisbane region. This $300 million project consists of 108 2XL unit Tesla Megapacks, and is scheduled to become fully […]

Rangebank BESS

Located 40km south-east of Melbourne CBD, The Rangebank BESS provides enough power for 80,000homes at peak capacity, playing a crucial role in the transition to greener energy in Victoria. Amplex is proud to have supplied LV & DC SDI flexible cables with Class 5 aluminum conductors

Diamantina Power Station

The Diamantina Power Station plays a crucial role in the generation of renewable energy in the Mount Isa region of Queensland, producing electricity sufficient for the local communities and mines, with lower emissions and higher efficiencies than traditional coal-fired power plants. The 242 MW power station holds scope for expansion, meeting the growing demand for […]

Collie BESS

Located 213 kilometres south of Perth, in Western Australia, the 500MW Collie Battery Energy Storage System forms a critical part of WA’s decarbonisation strategy of 2030. The Collie BESS replaces coal-fired power generation with both renewable energy generation infrastructure and an energy storage system. Amplex is proud to have actively participated in the ongoing development […]

Port Hedland BESS

The Port Hedland Battery Energy Storage System (BESS) project is a new 35MW / 36.7 MWh facility designed to replace the traditional spinning reserve provided by the gas-fired power station. This project integrates the BESS to provide instantaneous grid support, effectively linking with the existing Port Hedland Power Station. By doing so, it supports the […]

White Rock Solar Farm

White Rock Solar Farm is a 175 MW solar PV development located adjacent to the northern end of White Rock Wind Farm, 20 km west of Glen Innes. The project received Development Consent from the NSW Department of Planning and Environment on 14 June 2016. Construction of the project was completed in the second half […]

Broken Hill Secondary System Replacement

The Broken Hill 220/22kV substation serves as a critical connection point for supplying the Essential Energy networks in the region. Additionally, it facilitates the connection of the Silverton Wind Farm and the Broken Hill Solar Plant. This substation is integral to the broader Southwestern NSW network, crucial for supporting the development of renewable energy zones […]

Marulan Substation

With a voltage of 330kV, TransGrid’s Marulan Substation is an essential link in the transmission network connecting Snowy Hydro power generation facilities to major renewable energy farms in the Southern Highlands of New South Wales. This project supports efficient power distribution connecting to the main transmission network, providing electricity and power supply to support major […]

Tallawarra B Power Station

Located on the south-east coast of NSW, this project is a 320MW addition of a gas-fired power station that can supply power at full capacity within 30 minutes of start-up, supporting the grid during peak demand. It forms a fundamental role in reducing harmful emissions through unsustainable, environmentally damaging power generation, by improving efficiency of […]

Aldoga 275/33kV Substation

The Aldoga Substation project contributes to the expansion of electricity infrastructure in Queensland, to meet the growing demand for power supply. Situated in the Gladstone region, the Aldoga Substation supports the growth of both manufacturing and renewable energy industries, with the purpose of increasing the capacity of the electricity network to meet the demands of […]