Collector Wind Farm

The Collector Wind Farm, is a 54 turbine wind farm installation in southern NSW. It reached full generation in February 2021, with 226.8MW capacity, and a project cost of $360 million. Scope of Supply MV Cables | TransGrid Spec Secondary System Cables Flexible SDI Cables
Botany Rail Duplication

The BRD project contributes to a reduction in traffic congestion caused by road freight and truck movements, as the efficiency of rail networks is enhanced to meet present and future demands. The remaining 2.9km section of single line track into Port Botany will be duplicated in the Botany Rail Duplication (BRD) project, widening the freight […]
Crookwell Substation

The Crookwell 330kV Substation is an essential electrical substation located in Upper Lachlan Shire, New South Wales. It is strategically positioned in close proximity to prominent geographic features, including Pigmans Hill and Black Hill. This contract was won by one of our experienced project consultants here at Amplex, as our background in such power projects […]
Parkes Solar Farm

The Parkes Solar Farm Project is an area of up to 240 hectares, generating 65MW of power. The development of this commercial scale solar electricity power station is justified in terms of reducing Australia’s GHG emissions and meeting the future energy demands of our country. It has a notable contribution to Australia’s renewable energy targets, […]
Gannawarra Solar Farm

The Gannawarra solar farm project entails the development of a 510MW solar farm, with further plans for an additional 1200MW of power generation. Situated in Gannawarra Shire, 13 kilometers west of Kerang in the Australian state of Victoria. The construction of Stage 1 for both the Gannawarra Solar Farm and the Gannawarra Energy Storage System […]
Dubbo Regional Rail Maintenance Facility

The Dubbo Regional Rail Maintenance Facility is part of the Transport for NSW Regional Rail Project . Delivered over 3 stages, the Dubbo East Junction received realignment and resignaling, 116 non-commissioned detection points were installed, and the Mindyarra Maintenance Centre was commissioned, in order to maintain the new Regional Rail fleet upon construction completion. The […]
Cabramatta Loop

The Cabramatta Loop Project aims to boost rail freight capacity on the Southern Sydney Freight Line by enabling smooth passage for freight trains in both directions. It involves 1.65 kilometres of new rail track and 550 metres of track realignment. Combined with the Botany Rail Duplication, it will significantly enhance the capability of container freight […]
Riverina BESS

The Riverina and Darlington Point Energy Storage Systems, totalling 150MW / 300MWh combined capacity, are situated in close proximity to TransGrid’s Darlington Point Substation within the Murrumbidgee Shire, Southwest NSW. The Riverina BESS project contributes to the journey toward reducing Australia’s carbon footprint, moving the nation closer to emission reduction targets as the government, businesses […]
Kidston Solar Farm

Kidston Solar Farm is a two phase project located in Northern Queensland on the site of the historical Kidston Gold Mine. Phase One of the project at 50MW AC output is predicted to generate 145GWh of renewable electricity per year when it commences operation in early 2018. The project consisted of 540,000 solar panels. The […]
Albury 132kV Substation Secondary Systems Upgrade

The 132kV Substation at Albury was upgraded as part of TransGrid’s investment in safe, reliable and efficient supply of electricity to the southern NSW region. The upgrade included replacement of secondary systems including replacement of a large amount of LV cabling. Amplex drew on extensive experience with TransGrid specifications to design and manufacture LV control […]