Broken Hill Secondary System Replacement

The Broken Hill 220/22kV substation serves as a critical connection point for supplying the Essential Energy networks in the region. Additionally, it facilitates the connection of the Silverton Wind Farm and the Broken Hill Solar Plant. This substation is integral to the broader Southwestern NSW network, crucial for supporting the development of renewable energy zones […]

Marulan Substation

With a voltage of 330kV, TransGrid’s Marulan Substation is an essential link in the transmission network connecting Snowy Hydro power generation facilities to major renewable energy farms in the Southern Highlands of New South Wales. This project supports efficient power distribution connecting to the main transmission network, providing electricity and power supply to support major […]

Tallawarra B Power Station

Located on the south-east coast of NSW, this project is a 320MW addition of a gas-fired power station that can supply power at full capacity within 30 minutes of start-up, supporting the grid during peak demand. It forms a fundamental role in reducing harmful emissions through unsustainable, environmentally damaging power generation, by improving efficiency of […]

Aldoga 275/33kV Substation

The Aldoga Substation project contributes to the expansion of electricity infrastructure in Queensland, to meet the growing demand for power supply. Situated in the Gladstone region, the Aldoga Substation supports the growth of both manufacturing and renewable energy industries, with the purpose of increasing the capacity of the electricity network to meet the demands of […]

Collector Wind Farm

The Collector Wind Farm, is a 54 turbine wind farm installation in southern NSW. It reached full generation in February 2021, with 226.8MW capacity, and a project cost of $360 million. Scope of Supply MV Cables | TransGrid Spec Secondary System Cables Flexible SDI Cables

Botany Rail Duplication

The BRD project contributes to a reduction in traffic congestion caused by road freight and truck movements, as the efficiency of rail networks is enhanced to meet present and future demands. The remaining 2.9km section of single line track into Port Botany will be duplicated in the Botany Rail Duplication (BRD) project, widening the freight […]

Crookwell Substation

The Crookwell  330kV Substation is an essential electrical substation located in Upper Lachlan Shire, New South Wales. It is strategically positioned in close proximity to prominent geographic features, including Pigmans Hill and Black Hill. This contract was won by one of our experienced project consultants here at Amplex, as our background in such power projects […]

Parkes Solar Farm

The Parkes Solar Farm Project is an area of up to 240 hectares, generating 65MW of power. The development of this commercial scale solar electricity power station is justified in terms of reducing Australia’s GHG emissions and meeting the future energy demands of our country. It has a notable contribution to Australia’s renewable energy targets, […]

Gannawarra Solar Farm

The Gannawarra solar farm project entails the development of a 510MW solar farm, with further plans for an additional 1200MW of power generation. Situated in Gannawarra Shire, 13 kilometers west of Kerang in the Australian state of Victoria. The construction of Stage 1 for both the Gannawarra Solar Farm and the Gannawarra Energy Storage System […]

Dubbo Regional Rail Maintenance Facility

The Dubbo Regional Rail Maintenance Facility is part of the Transport for NSW Regional Rail Project . Delivered over 3 stages, the Dubbo East Junction received realignment and resignaling, 116 non-commissioned detection points were installed, and the Mindyarra Maintenance Centre was commissioned, in order to maintain the new Regional Rail fleet upon construction completion. The […]